Air Conditioning Renovation for Madrid Metro Line 1 Trains

The Community of Madrid allocates 3.4 million euros to replace air conditioning components in the 2000-A series trains.

Generic image of the interior of a subway train carriage with the air conditioning unit visible.
AI

Generic image of the interior of a subway train carriage with the air conditioning unit visible.

The Community of Madrid has authorized the contracting of works to renovate the air conditioning systems of the 2000-A series trains operating on Metro Line 1, with an investment of 3.4 million euros.

The Governing Council has approved the tender procedure for these tasks, which will have an execution period of nine months. The contract includes the replacement of 720 air conditioning components, divided into 360 condenser batteries and an equal number of evaporators. The spare parts will be manufactured according to the technical characteristics and age of the current equipment.
The main objective of this intervention is to restore the original performance of the air conditioning systems and ensure their proper functioning throughout the remaining service life of the trains. This aims to improve the reliability and availability of the trains, as well as passenger comfort, especially during months of high temperatures.
Additionally, ahead of next summer, Metro de Madrid will conduct a comprehensive review of the air conditioning for this fleet. This review will complement routine maintenance tasks and serve to check the overall condition of all equipment.
Based on information from the official source: Comunidad de Madrid — Notas de prensa (18/11/2026)